![]() |
![]() |
||||||
|
Custom-built Premises Celtic Recycling relocated to its current Bridgend site in February 1993. A major investment over a four year period resulted in the provision of state-of-the-art facilities for the disposal, processing and recycling of end-of-life heavy electrical equipment. Ongoing investment in the facility has ensured that Celtic Recycling continue to be the market leader in the management of these waste resources. All plant items considered hazardous or difficult are transported by Celtic Recycling to the Bridgend facility, where the environmental protection measures and controls greatly exceed those required under current environmental legislation. Environmental safeguards include:
Current process facilities on site include:
In addition to the main entrance which is equipped with a 50 tonne capacity weighbridge, the facility also benefits from a dedicated abnormal load entrance which is capable of receiving the largest vehicles and loads able to travel on the UK’s highways today. Transformers and other capital assets up to 110 tonnes in weight are routinely offloaded in the dedicated heavy off-load area utilising the company’s in-house bespoke jacking and winching system. The Celtic Recycling Bridgend site is the only UK site licensed to receive and process all types of electrical equipment, including plant contaminated with hazardous wastes such as mercury, asbestos, polychlorinated biphenyls (PCBs) and SF6 (sulphur hexafluoride).
|
|
|||||